08 — Cleaning Services
Post Construction Cleaning
The clean that turns a finished site into a handover-ready space — staged across rough, intermediate and final passes.
Overview
Professional cleaning after construction, renovation or maintenance work.
Construction dust does not behave like household dust. It is fine, it is abrasive, and it settles a second and third time after the first clean. Cleaning a site once and calling it finished produces a space that looks dusty again within a day.
Hope Star works post-construction cleaning in stages. A rough clean removes debris, protective films, adhesive residue, paint spots and stickers. An intermediate clean deals with the settled dust that follows. A final pass polishes glass, sanitary ware, ironmongery and floors immediately before handover, when trades are off site.
Teams work with appropriate footwear and protection so that newly laid floors, fitted joinery and installed sanitary ware are not damaged in the process of cleaning them.
Scope
What this service includes
- 01Removal of construction debris, offcuts and packaging
- 02Peeling of protective films from glazing, joinery and appliances
- 03Adhesive, paint spot, plaster and grout haze removal
- 04Full dust extraction from ceilings, ledges, ducts and voids
- 05Interior and reachable exterior glazing to a polished finish
- 06Sanitary ware, tapware, ironmongery and fittings detailing
- 07Floor washing and treatment appropriate to the new surface
- 08Final pre-handover pass once trades have left site
Suited to
- New-build residential and commercial handovers
- Fit-out and refurbishment completions
- Villa and apartment renovations
- Maintenance works requiring a make-good clean
Key benefits
Why customers ask for it
- Staged, not single-pass
- Rough, intermediate and final cleans account for dust that settles repeatedly.
- New finishes protected
- Methods are chosen to avoid marking new floors, joinery and sanitary ware.
- Timed to handover
- The final pass runs after the last trade leaves, so the space stays clean for inspection.
- Snag-ready
- A properly cleaned space makes defects visible, which shortens the snagging cycle.
Method
How the work is carried out
- 01
Review the programme
Cleaning stages are planned against the construction programme and handover date.
- 02
Rough clean
Debris, packaging, films, adhesive and paint residue are cleared from the space.
- 03
Intermediate pass
Settled dust is extracted from ceilings down, after the first round of trades finishes.
- 04
Final detail
Glazing, sanitary ware, ironmongery and floors are detailed once site is clear.
- 05
Handover walk
The space is walked with the contractor or client and any defect is corrected before sign-off.
In detail
Post Construction Cleaning in practice
Construction workers on site during the building phase
A completed property exterior at dusk after handover
Finishing works being completed inside a property
Enquiries
Request a Quote — Post Construction Cleaning
Tell us about the space and how often it needs attention. We will come back with a written scope and a price — no obligation.
- Phone
- +974 3370 0162
- Location
- Street 860, Zone 6, Building 19, Doha, Qatar
- Business hours
Saturday – Thursday 7:00 — 19:00
Friday On request
